LIMITED CONTAMINATION ASSESSMENT 2/9/2026
Safeguard EnviroGroup Limited Contamination Assessment – Airborne and Surface Fungal Structures report for Project No. 44-68-956POM dated February 9, 2026. Based on the results of the observations, all recorded data collected and laboratory analysis, there is no indication of microbial amplification or aerosolized elevation of fungi spores or conditions which would support microbial growth in the area(s) of investigation. -
Post Mold Remediation Verification 2/5/26
Safeguard EnviroGroup Post Mold Remediation Verification (PRV) Report for Project No. 44-68-891PRV, dated February 5, 2026, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection. -
Post Mold Remediation Verification 2/2/26
Safeguard EnviroGroup Post Mold Remediation Verification (PRV) Report for Project No. 44-68-825PRV, dated February 2, 2026, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection. -
Post Mold Remediation Verification 1/30/26
Desert Mirage High School and Toro Canyon Middle School: Safeguard EnviroGroup Post Mold Remediation Verification (PRV) Report for Project No. 44-68-579PRV2, dated January 30, 2026, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection. -
LIMITED CONTAMINATION ASSESSMENT 1/29/2026
Desert Mirage High School and Toro Canyon Middle School: Safeguard EnviroGroup Limited Contamination Assessment – Airborne and Surface Fungal Structures report for Project No. 44-68-740 dated January 29, 2026. -
LIMITED CONTAMINATION ASSESSMENT 1/23/2026
Desert Mirage High School and Toro Canyon Middle School: Safeguard EnviroGroup Limited Contamination Assessment – Airborne and Surface Fungal Structures report for Project No. 44-68-488 dated January 23, 2026. Based on the limited assessment, observations, data collected, and laboratory analysis, results indicated evidence of indoor mold contamination.